Reconstructing an Engineering Change

 

Reconstructing an Engineering Change

A hands-on workshop derived from Chapter 3 of Engineering Intelligence.

90 minutes · 4 hands-on segments

Learning outcomes

After this workshop you can:

  • Draw the boundary of one Engineering Change from a messy artifact pile

  • Enumerate linking signals between artifacts and assign a defensible confidence

  • Sketch a change graph — intents, PRs, deploys, approvals — annotated with provenance

  • Attribute cost, latency, and blast radius to a reconstructed change instead of to individual PRs

  • Name the failure modes your own reconstruction is most exposed to

The problem

Friday afternoon. A payments incident.

Leadership asks: "What change caused this, what did it cost us to build, and who’s on point for the fix?"

Your evidence: 4 pull requests across 2 repos, 3 tickets (one closed as duplicate), a feature flag, two deployments six hours apart, and a Slack thread nobody remembers.

What is the "unit of change" you’re going to attribute this to?

Try to answer with PRs alone. Notice what falls off the table.

Why the pull request isn’t the unit

A customer capability may span web, mobile, API, shared library, migration, flag, deploy, docs, verification. Each in a different system.

The reverse: one PR often bundles refactor + dependency bump + feature — three unrelated intents in one artifact.

Repository conventions decide the boundary — not engineering intent.

Measurement must separate observable artifacts from the logical change they realise.

The Engineering Change, formally

An Engineering Change is the temporally bounded set of activities that transform one coherent intent into one or more accepted outcomes.

\[E = (I, A, R, O, \tau, \Pi)\]

Intent \(I\) · Artifacts and activities \(A\) · Relationships \(R\) · Outcomes \(O\) · Time \(\tau\) · Provenance \(\Pi\).

The last one — provenance — is what makes the graph auditable.

The artefact pack

Each pair receives a printed pack:

  • 4 pull requests across 2 repositories (titles, authors, timestamps, files touched, references)

  • 3 tickets — one open, one closed-fixed, one closed-as-duplicate

  • 2 deployment records with build IDs

  • 1 feature-flag configuration change

  • 1 incident record from four days later

  • 1 design doc fragment

None of them carry an Engineering-Change: trailer. Welcome to your existing estate.

Segment 1 (15 min) — draw the boundary

Pair up. Read the pack.

On paper, list which artefacts you believe belong to the same Engineering Change and which do not. Circle the boundary. Put question marks on the ones you’re unsure about.

Do not draw edges yet. Just membership.

Report back: one artefact your pair fought about, and the argument that changed one of your minds.

What did you actually use?

You just used signals — even if you didn’t name them.

  • Shared ticket ID or explicit reference

  • Overlapping authors or reviewers

  • Temporal proximity

  • Shared files, packages, or services

  • Coordinated deployments

  • Shared feature-flag names

  • Semantic similarity of titles and descriptions

Every one of these is inferential. None is ground truth.

Signals aren’t equal

SignalTypical weightFails when…​

Explicit change-ID trailer

1.00

Rarely — this is declared linkage

Ticket reference in PR body

high

Ticket stale, reused, or copied across unrelated work

Shared author + tight window

medium

Active engineers straddle many changes

Coordinated deploy window

medium

Release train batches unrelated intents

Semantic title similarity

low

Template titles ("bump deps", "fix flake")

Same feature flag

high

Flag reused for a follow-up epic

Confidence, as a first-class attribute

Every membership decision carries a number.

ClassRangeUse it for…​

Declared

1.00

Executive attribution, financial reporting

Strongly inferred

0.90–0.99

Governed metrics, cost accounting

Inferred

0.70–0.89

Team dashboards, flow analytics

Tentative

0.50–0.69

Exploration only

Rejected

below

Not in the graph

The threshold depends on which decision the number will support.

Segment 2 (20 min) — score the signals

Back in your pair. For each artefact you provisionally included in Segment 1:

  1. List every signal that links it to the intent

  2. Assign each signal a weight (your own — argue about it)

  3. Multiply or combine to a membership confidence in [0,1]

  4. Classify it: declared / strongly inferred / inferred / tentative / rejected

Re-examine your boundary. Do any artefacts fall below your threshold?

Report back: one artefact you demoted after scoring, and the signal you had over-trusted.

From membership to graph

Membership tells you which artefacts belong. The graph tells you how they relate.

\[G_E = (V_E, E_E, X_V, X_E, T)\]
Engineering Change lifecycle

Edges — IMPLEMENTS, DEPENDS_ON, REVIEWS, DEPLOYS, VERIFIES, ROLLS_BACK, CAUSED_BY — carry time, source, and confidence just like nodes.

Provenance rides every edge

An edge answers "why are these linked?" — not just that they are.

{
  "artifact": "repo-a#1842",
  "engineeringChange": "EC-01J8...",
  "confidence": 0.96,
  "evidence": [
    {"type": "ticket_match", "value": "PAY-431", "weight": 0.52},
    {"type": "explicit_pr_reference", "value": "repo-b#991", "weight": 0.27},
    {"type": "coordinated_deployment", "windowMinutes": 18, "weight": 0.11}
  ],
  "modelVersion": "reconstruct-v3.4"
}

Silent mutation destroys trust. Every link must be reversible with an explanation.

Segment 3 (20 min) — draw the change graph

Take a fresh sheet.

  1. Put the intent at the top (one node — the coherent purpose)

  2. Add each accepted artefact as a node

  3. Draw typed edges between them: IMPLEMENTS, REVIEWS, DEPLOYS, VERIFIES

  4. On each edge, annotate: source of the link, signal(s) used, confidence

  5. Mark the outcome node — accepted, partial, rolled back, abandoned

Do not skip the annotation. That is the exercise.

Report back: the edge with the lowest confidence on your graph, and what would raise it.

The graph unlocks questions PRs can’t

  • Which artefact lies on the critical path?

  • How many repo and ownership boundaries were crossed?

  • Which approvals delayed acceptance?

  • Did the incident originate from a change spanning several repositories?

  • How much human and AI effort accumulated across the whole change?

Each is a graph traversal, not a flat-table query.

Critical path and blast radius

Path duration through the DAG of your change:

\[T(E) = \max_{p \in Paths(E)} \sum_{a \in p} d(a)\]
  • Latency = time along the critical path from intent to accepted outcome

  • Cost = effort accumulated across all artefacts and reviews, weighted by confidence

  • Blast radius = services, teams, and users affected by the outcome (or by its rollback)

Attributing any of these to a single PR under-counts, over-counts, or attributes to the wrong owner.

Weighted cost, honestly

For your reconstructed change, effort splits by evidence class:

\[\widehat{C}(E) = \underbrace{\sum_{a \in A_d} c(a)}_{\text{deterministic floor}} + \sum_{a \in A_p} c(a) \cdot conf(a \in E)\]

Report a floor (deterministic only), an expected (confidence-weighted), and a ceiling (all evidence unweighted). Do not collapse them to one number on an exec slide.

Analogy from Chapter 3’s worked example: 20.3h floor, 24.1h expected, 26.4h ceiling — all three ship together, all three stamped reconstruct-v3.4.

Segment 4 (15 min) — attribute the incident

Return to the incident record in your pack. It surfaced four days after the second deployment.

Using only the graph you drew:

  1. Which artefact(s) are the most plausible cause? What’s your confidence?

  2. Which owners would you page? What’s the smallest set?

  3. What is the blast radius — services, users, downstream changes?

  4. If you had to report a cost of the change so far to your CFO, what floor / expected / ceiling would you cite?

Report back: the attribution decision your pair is least confident about, and what evidence would move it.

Failure modes you just felt

  • Ticket links as ground truth — one of your tickets was closed-as-duplicate. Did you trust it?

  • Clustering by author + time — did an active engineer create a false join?

  • Ignoring deployment evidence — flow truncates at merge; your incident lived downstream

  • Displaying inferred links as facts — did any 0.7 edge sneak onto the exec slide?

  • One giant initiative node — did you resist the temptation to lump?

  • Recomputing without versioning — every number needs a model version stamp

What to take home

  • You now have a reconstructed change graph for one real intent

  • You have floor / expected / ceiling effort numbers, each with provenance

  • You have a list of signals your organisation has — and the ones it lacks

  • You have a confidence threshold you can defend for the next decision class up

The next step in your own estate is to instrument a change ID and earn declared-linkage confidence for new work — while keeping probabilistic reconstruction for the backlog.

Reading and running

  • Read: Chapter 3 of Engineering Intelligence

  • Run: companion/notebooks/08-engineering-change-reconstruction.py — the reference implementation of the worked example

  • Next: Chapter 4 — attributing the cost you just estimated, honestly

Close

Pull requests are what your tools happen to record.

The Engineering Change is what your organisation was actually trying to do.

Reconstruct the second one — with confidence, provenance, and a version stamp — and the rest of the book has something to measure.