Motor branch circuit (Article 430)
Size a motor circuit by NEC Article 430: full-load current, conductors, breaker or fuses by Table 430.52, overloads, disconnect, grounding conductor, starting kVA and voltage dip, a feeder for several motors, and a one-line summary card.
Added · updated 28 October 2026
Works with
- Wire size and voltage drop US electricalCheck voltage drop opens it with the motor current at 125 %, voltage, phase and conductor
How to use it
A planning aid. It follows NEC 2023 Article 430 (the tables and percentages are the same in 2020). Check the edition your jurisdiction has adopted and its amendments; the inspector and the motor’s and controller’s instructions win.
How to use it
One motor — choose the supply (three-phase, single-phase or DC), the motor’s voltage (the tables use 115, 230, 460 and 575 V for 120, 240, 480 and 600 V systems, with their own 200 and 208 V columns) and horsepower, the motor type, the short-circuit device (inverse-time breaker, dual-element fuse, non-time-delay fuse or instantaneous-trip breaker), the nameplate current and service factor, copper or aluminium, the terminal temperature rating and the code letter.
The cards give the full-load current, the conductor, the breaker or fuse, the overload setting and the disconnect. The summary card below is laid out like the motor block on a one-line drawing — disconnect, short-circuit device, controller and overload, conductors with the grounding conductor, locked-rotor kVA — with the steps and sections underneath. Print prints the card alone.
Starting — the locked-rotor kVA range for the code letter (Table 430.7(B)), the starting draw for across-the-line, wye-delta, autotransformer, soft-starter or VFD starting, and a rough voltage dip on a generator (its transient reactance, typically 0.2–0.3 per unit) or a transformer (its impedance), plus the generator size for a dip you choose. Generator makers size for motor starting with their own data; treat this as a first look.
Several motors — motors on one feeder at one voltage, plus other loads: conductors at 125 % of the largest motor plus the rest (430.24), and the largest feeder breaker allowed (430.62(A)), rounded down.
The rules, in short
Wire, fuse or breaker and disconnect start from the table full-load current, not the nameplate (430.6(A)(1)); overloads use the nameplate. Conductors carry 125 % (430.22). The short-circuit and ground-fault device is sized for starting, not for the wire — inverse-time breaker 250 %, dual-element fuse 175 %, non-time-delay fuse 300 %, instantaneous trip 800 % (1100 % Design B premium efficiency), less for wound-rotor and DC motors; next size up if it isn’t a standard size, more under Exception No. 2 if the motor won’t start. Overloads at 125 % of the nameplate (115 % below a 1.15 service factor). Disconnect horsepower-rated and at least 115 % of the full-load current.
Related: shop power planner (workshop machines on their circuits and whether a start trips the breaker), panel schedule, dwelling load, wire size and voltage drop, conduit fill, grounding and bonding, transformers, fault current, energy usage.